Marine planning
Power-outage drain-down estimator
Estimate display drain-down and plumbing volume so a sump reserve plan has visible assumptions.
Marine planning
Build the estimate
Result
Power-outage drain-down estimator
Display drain estimate3.6 LDisplay area × estimated water-level drop.
Reserve planning volume5.6 LIncludes 2 L entered plumbing volume.
Use the result responsibly
Transparent math, visible limits.
This is not a guarantee against flooding. Actual plumbing behavior must be tested with equipment safely supervised.
Formula shownEvery result explains the arithmetic or assumption used.
Save locallyUse My Tank Workspace for browser-local notes and repeat planning.
Read the guideOpen the related research and examples.